Building a new unheated room under the existing deck with a storage area under part of the existing stairs. Room will have PVC paneling/shadow boxes below windows (interior and exterior), sliding windows, doors, composite trim interior and exterior. We removed the...
Our clients had us install a new 3/4 bathroom in their basement. The bathroom features a tile floor, acrylic shower enclosure, single vanity, toilet, mirror and exhaust fan/light combo. Bathroom-Remodel-Kathy-S-01...
Update on our 2nd Story Addition in Andover MA Master bath addition in the 2nd story Andover project. Double vanity with granite counters, large walk in tiled shower with rain head, handheld and bench Update on our 2nd Story Andover Addition: Siding completed. Hardi...
Wilmington project. We did a finished basement with bedroom, 3/4 bath with built in, playroom, new steps, and floating floor. We finished the attic which included an open office/playroom and carpeting. Both spaces have their own minisplits for heat and ac....
A recent front porch renovation in Billerica. We removed the existing decking, all posts, steps, handrails/balusters, trim and lattice. The stairs were reframed to widen to 4′. New 4×6 posts, composite decking, trim, crown and base detail moldings were...
A single story pool room addition with rooftop deck and stairs to the lawn. The pool room addition also includes a new 3/4 bath with tiled floor, tiled steam shower and custom cabinets/shelves. Tile was also installed around the...