Our clients had us install a new 3/4 bathroom in their basement. The bathroom features a tile floor, acrylic shower enclosure, single vanity, toilet, mirror and exhaust fan/light...
Room Addition Over Garage Replaced windows, finished with composite exterior trim. Insulation was installed under new subfloor. We framed for a new closet along the front of the space and added 2 entry doors. Mopboards were installed along the staircase and a 1/2 wall...
Building a new unheated room under the existing deck with a storage area under part of the existing stairs. Room will have PVC paneling/shadow boxes below windows (interior and exterior), sliding windows, doors, composite trim interior and exterior. We removed the...
Our clients had us install a new 3/4 bathroom in their basement. The bathroom features a tile floor, acrylic shower enclosure, single vanity, toilet, mirror and exhaust fan/light combo. Bathroom-Remodel-Kathy-S-01...
Update on our 2nd Story Addition in Andover MA Master bath addition in the 2nd story Andover project. Double vanity with granite counters, large walk in tiled shower with rain head, handheld and bench Update on our 2nd Story Andover Addition: Siding completed. Hardi...