Steps from FL1 were infilled; a new rear deck has been added with composite decking, steps to yard and stainless steel cable rail system. A wall of windows keeps the FL2 space light and bright, Exterior materials include primed cedar clapboard, PVC trim and PVC...
Our clients had us install a new 3/4 bathroom in their basement. The bathroom features a tile floor, acrylic shower enclosure, single vanity, toilet, mirror and exhaust fan/light...
Room Addition Over Garage Replaced windows, finished with composite exterior trim. Insulation was installed under new subfloor. We framed for a new closet along the front of the space and added 2 entry doors. Mopboards were installed along the staircase and a 1/2 wall...